To suspend operations while a cementslurry to develops sufficient compressive strength to allow drilling or other wellbore activity to continue. The WOC time is generally used to test the surface pressure-control equipment, such as the BOP stack. Attempting to drill out the float or guide shoe before the cement has developed sufficient bond strength may result in backing off a casing joint.

Related Terms:

cementing
guide shoe